LANDPOWER
The AI economy needs land with power on it.
Britain has very little of it. We are going to assemble more.
The problem.
What every AI company needs, and can't get.
LAND
Big enough for a data centre. Usually 10-50 acres.
POWER
A grid connection of 25-100MW. Same as a small town.
PERMISSION
Planning consent. From the local council.
All three. On the same plot. At the same time. Typical wait: 3-5 years.
The companies who need it can't wait that long.
The window opened.
Three shifts. All in the last year.
Grid reform
Connection queue unblocked.
AI Growth Zones
Government designated priority sites for power.
Planning fast-tracked
Data centres now National Infrastructure.
A decade of structural change, condensed into twelve months.
The buyers.
Everyone building AI needs land with power.
Demand exceeds supply by a factor of twelve.
LANDPOWER
UK powered land. For the AI decade.